Great Guildford Street, London

Scope:

  • Modernisation of existing building with main structure rebuilt and existing façade retained.
  • 55 tonnes of structural steel and metal decking with concealed columns in the dividing walls.  

Challenges:

  • Central London with no on-site parking or lay-down area.
  • All deliveries to be unloaded direct from road via on-site crane.
  • Complex interfacing with combination of irregularly-shaped existing structure and new build.